Gold Member Since 2015
Audited Supplier
Qingdao Create Trust Industry Co., Ltd.

Rubber Tile Press, Rubber Tile Molding Press, Rubber Tile Curing Press manufacturer / supplier in China, offering 50t Rubber Tile Curing Press/Rubber Paver Tile Molding Press/Rubber Tile Press, Pin Barrel Cold Feed Rubber Extruder Machine, 18 Inch Rubber Crusher Mill for Waste Tire Recycling/Rubber Cracker Mill and so on.

(/ )

Supplier Homepage Product Rubber vulcanizing machine 50t Rubber Tile Curing Press/Rubber Paver Tile Molding Press/Rubber Tile Press

50t Rubber Tile Curing Press/Rubber Paver Tile Molding Press/Rubber Tile Press

FOB Price: US $3,000-4,800 / Set
Min. Order: 1 Set
Min. Order FOB Price
1 Set US $3,000-4,800/ Set
Get Latest Price
Port: Qingdao, China
Production Capacity: 300sets/Month
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: XLB550*550*4
  • Condition: New
  • Automatic Grade: Automatic
  • Heating Method: Electric/Oil/Steam
  • Advantage1: No Oil Leakage
  • Temperature: High Precision, Tolerance 1 Degree
  • Transport Package: in Wooden Case Safety Packing
  • Origin: China
  • Certification: SGS, CE, ISO
  • Customized: Customized
  • Structure: Horizontal
  • Size: 550X550mm
  • Advantage2: Without Pressure off
  • Trademark: CX
  • Specification: ISO9001, SGS, CE
  • HS Code: 8477800000
Product Description
50t Rubber Tile curing press/Rubber paver Tile molding press/Rubber Tile Press

Rubber  tile  is made of two layers of different rubber granulates, color granulates are fine granulates or rubber wire in surface, the bottom layer is thick rubber granulates or rubber wire.
Following is the main processes:

 1.conching: Put the rubber granulates and stain into the stirring barrel to stir,and then put into the  adhesive to stir,this process requires for 4-6 minutes( because the adhesive is easy 
to cure, so stir it when use ).

2.Weighing raw materials: weight the rubber granulates stirred, according to the granulates' thickness  requirement of the tiles .

3. Paving and pressing: Paving the rubber granulates weighted on the mold, then floated it by
 trowel. Firstly paving the surface rubber granulates which is fine and color, then the thickness and black.

4. Vulcanization molding: Covering anti adhesion cloth, pushing the mold intovulcanizer to 
vulcanize,the time of vulcanization accord to the thickness of the rubber tiles, in general, 
38inutes finished. After that, Mold separate automatic, thenremove floor tile on the shelves to
 dry.

5. Inspecting: Inspect the surface of the floor tiles formity, no aberration, no flaw, line with the product quality.

technical parameter:

 

S.no   
ModelXLB-D550×550×4/0.5MNXLB-D650×650×2/0.5MN
          1Nominal clamping force (MN)0.50.5
          2Heating platen size(mm)550×550650×650
          3Plate clearance (mm)150150
          4Working layers42
          5Piston stroke (mm)400400
          6Plate unit area pressure (Mpa)1.653.20
          7Overall dimension (mm)2200×900×22002200×1200×2400
          8Weight (kg)36005000
50t Rubber Tile Curing Press/Rubber Paver Tile Molding Press/Rubber Tile Press50t Rubber Tile Curing Press/Rubber Paver Tile Molding Press/Rubber Tile Press50t Rubber Tile Curing Press/Rubber Paver Tile Molding Press/Rubber Tile Press
50t Rubber Tile Curing Press/Rubber Paver Tile Molding Press/Rubber Tile PressFAQ
1. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
 From engineer designing to production completion, it needs about 25 to 35 days.
 
2. What does your factory do regarding quality control?
 We pay much more importance to quality control from the very beginning to the end of production.
 Every machine will be fully assembled and carefully tested before shipment.
 
3. What's the machine quality guarantee?
Quality guarantee time is one year.We choose world famous brand components to keep our machine in perfect working condition.
 
4. Are you able to give installation and commissioning overseas? How long time will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
 Small machine usually takes within 2~3 days.
 Big plant usually takes about 30 days.
 
5. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
 
6. How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport.
We will pick up you at the airport.

 
Send your message to this supplier
Avatar
Mr. Chris
*From:
To: Mr. Chris
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now