• Xkp-450 Rubber Cracker Machine/Rubber Crusher Mill for Rubber Powder Process Line
  • Xkp-450 Rubber Cracker Machine/Rubber Crusher Mill for Rubber Powder Process Line
  • Xkp-450 Rubber Cracker Machine/Rubber Crusher Mill for Rubber Powder Process Line
  • Xkp-450 Rubber Cracker Machine/Rubber Crusher Mill for Rubber Powder Process Line
  • Xkp-450 Rubber Cracker Machine/Rubber Crusher Mill for Rubber Powder Process Line
  • Xkp-450 Rubber Cracker Machine/Rubber Crusher Mill for Rubber Powder Process Line

Xkp-450 Rubber Cracker Machine/Rubber Crusher Mill for Rubber Powder Process Line

Warranty: 5 Years
Service Life: ≥15 Years
Certification: CCC, CE, ISO
Voltage: 220V 380V 415V
Structure: Horizontal
Bush: Nylon Bush and Bearing Bush
Customization:

Contact Supplier

Diamond Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company, Group Corporation

Basic Info.

Model NO.
XKP-450
Reducer
Hardened Gear Teeth,After Heat Treatment
Lubrication
Oil or Grease Automatic
Transport Package
in Wooden Case Safety Packing
Specification
ISO9001, SGS, CE
Trademark
CX
Origin
China
HS Code
8477800000
Production Capacity
400sets/Month

Product Description

xkp-450 rubber cracker machine/rubber crusher mill for rubber powder processing line 

Application:
This machine is special equipment for crushing waste steel wire radial tyre under normal temperature, used to take out the steel wire of tyre in the scope of the size.
Rubber cracker mill is the main machine for rubber powder production line suitable for various nylon cord tires, steel tires, large-scale projects such as fetal broken small rubber block processing waste rubber products, rubber production out diameter 1.7mm ~ 0.55mmpowder.

Specification:
1. The rubber cracker is easy to operate with the 24-hour operation. Motor voltage starting using star - triangle, the effective protection of the motor, low energy consumption, wearing parts can repeat the cycle.
2. Rubber cracker mill, body parts, transmission parts, roller parts, safety devices, and lubrication systems. The machine configuration is various; Customers can select again referring to the following aspects:
3. Roller: Rubber crushing machine rollers have two choices of alloy chilled cast iron and cast steel.
4. Roller lubrication: The nylon tile and bearing two choices.
5. Reducer kinds: Soft tooth surface reducer, hard surface reducer and high Hardened reducer for the customers to choose from.
Advantage:

1.20 years on tire recycling machine manufacturing and exporting.
2. Delivery within 35 days.
3. Safety wood or plywood crates packing.
4. Full transportation insurance.
5. Sell to 126 countries on 6 continents.
6. One-stop rubber machinery solution in Qingdao Shun Cheong.
7. It has passed ISO9001: 2008 certificate.

Technical parameter:
Technical parameter \ Type XKP-400 XKP-450 XKP-560
Front roll diameter(mm) 400 450 560
Rear roll diameter(mm) 400(Groove roller) 450(Groove roller) 510(Groove roller)
Working length of rolls(mm) 600 650 680
Front roll surface speed(m/min) 17.32 23.2 25.56
Friction ratio 1:1.38 1:1.38 1:1.30
Max.nip(mm) 8 8 15
Motor power (kw) 45 55 75
dimension(L x W x H)(mm) 3950x800x1780 4770x1846x1835 5064x2284x1978
Xkp-450 Rubber Cracker Machine/Rubber Crusher Mill for Rubber Powder Process Line
Xkp-450 Rubber Cracker Machine/Rubber Crusher Mill for Rubber Powder Process LineXkp-450 Rubber Cracker Machine/Rubber Crusher Mill for Rubber Powder Process LineFAQ-Problems of customer concern:
About machine performance quality

1.       Q: How to guarantee the quality of outsourcing parts?
          A: First choice more than 4 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.       Q: Which brand of electric part?
          A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB Customer can specify the brand.
3.       Q: Which PLC:
           A: Siemens, Omron, Mitsubishi
4.       Q: How to control the quality?
           A: There are inspectors for inspecting equipment quality and performance, after a ssembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1.        Q: When the guide engineer arrive at customer's factory?
           A:  If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.        Q: What is the warranty time?
           A:   5 years after machine arrived at factory
2.        Q: How to solve the problem?
           A: Within half an hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.

Send your message to this supplier

*From:
*To:
avatar Mr. Jason
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now