rubber strip cutting machine/block cutting machine/waste tire ring cutting machine
Application: Crush the waste tire into rubber powder with advantage of environmental protection and energy saving, bright market prospect.
1. Tire Cutter: It is the first process of reclaiming waste tire, used to separate among the tire crown, side-wall and bead.
Highlights: The blade is excellent hardened alloy for wearing-resistance and long life.
Parameter:
Production Capacity (Pieces/Hour) |
60-80 |
Motor Power (KW) |
3 |
Motor Rotating Speed (R/Min.) |
1440 |
Dimension (MM) |
1300x900x1200 |
Weight (KG) |
300 |
2. Strip Cutter: It is mainly used in cutting the crown and side-wall of waste tire into certain width of rubber strip.
Highlights: The two disc knife adopts special metal heat treatment with high hardness and durability.
Parameter:
Production Capacity (KG/Hour) |
1500-2000 |
Motor Power (KW) |
5.5 |
Motor Rotating Speed (R/Min.) |
1440 |
Model of Reducer |
350 |
Reduction Ratio |
31.5 |
Size of Discharged Materials (MM) |
20-50 |
Dimension (MM) |
1300x700x1500 |
Weight (KG) |
670 |
3. Block Cutter: It is mainly used to cut the rubber strip in to block.
Highlights: The blade adopts excellent hardened alloy for wearing-resistance and long life.
Parameter:
Production Capacity (KG/Hour) |
1200-1500 |
Motor Power (KW) |
7.5 |
Motor Rotating Speed (R/Min.) |
1440 |
Size of Discharged Materials (MM) |
20-50 |
Dimension (MM) |
750x750x1200 |
Weight (KG) |
420 |
4. Bead Wire Separator: It is mainly used in separating rubber and steel wire of bead.
Highlights: Easy operation, Simple Maintaince.
Parameter:
Production Capacity (Pieces/Hour) |
70 |
Motor Power (KW) |
15 |
Motor Rotating Speed (R/Min.) |
1440 |
Model of Reducer |
400 |
Reduction Ratio |
40.17 |
Dimension (MM) |
1500x900x1400 |
Weight (KG) |
1300 |
5. Transportation System: Belt Conveyor + Vibrating Sieve + Magnetic Separator.
6. Rubber Shredder Machine:
Main Features:
a. Grooved & Smooth Roller: Chilled casting iron alloy.
b. Emergency brake device: Manual and automatic.
c. Famous motor.
d. Durable transmission system.
e. Esay assembly and operation.
f. CE, ISO approved.
Parameter:
Parameter \ Model |
XKP-560 |
XKP-450 |
XKP-400 |
Front roller diameter (MM) |
560 |
450 |
400 |
Back roller diameter (MM) |
510 |
450 |
400 |
Roller length (MM) |
800 |
650 |
600 |
Front roller surface speed (m/min) |
25.56 |
23.2 |
17.32 |
Friction ratio |
1:1.3 |
1:1.38 |
1:1.38 |
Max. nip |
15 |
8 |
8 |
Feeding capacity (KG/H) |
1500 |
600-800 |
200-300 |
Motor power (KW) |
75 |
55 |
45 |
Measurement (MM) |
5064x2284x1978 |
4770x1846x1835 |
3950x1800x1780 |
Weight (KG) |
19000 |
19000 |
19000 |
FAQ-Problems of customer concern:
About machine performance quality
1. Q: How to guarantee the quality of outsourcing parts?
A: First choice more than 4 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB Customer can specify the brand.
3. Q: Which PLC:
A: Siemens, Omron, Mitsubishi
4. Q: How to control the quality?
A: There are inspectors for inspecting equipment quality and performance, after a ssembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1. Q: When the guide engineer arrive at customer's factory?
A: If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1. Q: What is the warranty time?
A: 5 years after machine arrived at factory
2. Q: How to solve the problem?
A: Within half an hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.