China Manufacturer Hot Sale Rubber Calender

Product Details
Customization: Available
Certification: CE, ISO
Condition: New
Manufacturer/Factory, Trading Company, Group Corporation
Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001
  • China Manufacturer Hot Sale Rubber Calender
  • China Manufacturer Hot Sale Rubber Calender
  • China Manufacturer Hot Sale Rubber Calender
  • China Manufacturer Hot Sale Rubber Calender
  • China Manufacturer Hot Sale Rubber Calender
  • China Manufacturer Hot Sale Rubber Calender
Find Similar Products

Basic Info.

Model NO.
XY-450x1500
Automatic Grade
Automatic
Structure
Horizontal
Bush
Nylon Bush and Bearing Bush
Reducer
Hardened Gear Teeth,After Heat Treatment
Lubrication
Oil or Grease Automatic
Transport Package
in Wooden Case Safety Packing
Specification
ISO9001, SGS, CE
Trademark
CX
Origin
China
HS Code
8477800000
Production Capacity
400sets/Month

Product Description

China Manufacturer hot sale Rubber Calender

Qingdao Create Trust Industry Co., Ltd.make high quality rubber machine, from materials to producing, we use the good quality material, complete management system, also excellent aftersale service, we hope to be one reliable factory for you!

1.techincal specification

1. Rubber calender suitable for many rubber products, has high efficiency
2. Rubber calender can according to certain form arrangement, under certain temperature, extends the rubber or the plastic suppression certain thickness and the superficial shape film
3. Rubber calender may carries on to the textile fiber curtain canvas or the steel wire curtain cloth hangs the rubber the machinery.
4. The rubber calender have several type (two rolls/three roll/four rolls)you chose it according your need. 
5.Rubber calender made by our factory is mainly used for calendaring rubber film, rubber tape,etc 
6.Roller chilled alloy cast iron into a high quality steel production,chilled alloy cast iron rollers with sufficient hardness and wear resistance, and grinding smooth surface, high-quality steel roller 
can do the engraving of the desired pattern. Rollers can pass into the steam and cooling water, to regulate the temperature. 

7.Manufacturer from China

2.the Main Parameters of rubber calender
Type Dia.x Length of roll (mm) Linear speed of mid.roll (m/min) Min thickness of calendered product (mm) Width of calendered product(mm) Motor Power(KW) LxWxH(mm) Weight (t)
XY-3I1120 360x1120 7.5-22.5 ≥0.20 900 13.3/40 6050x1500x2240 11.6
XY-3I1400 400x1400 8.8-26.39 ≥0.20 1200 18.3/55 5600x1410x2385 15
XY-4F1120 360x1120 7-21 ≥0.20 900 18.3/55 6100x1660x2330 13
XY-4F1400 400x1400 8.8-26.39 ≥0.20 1200 25/75 6350x1850x2490 18
XY-3L1120 360x1120 2-20 ≥0.20 900 37 5500x1700x2300 11.7
XY-5T635 240x635 9 ≥0.50 550 7.5 1400x1000x1870 2
XY-5T700 230x700 1.5-13 ≥0.50 600 7.5 3600x1620x1030 3.5
XY-4r1730 610x1730 5.4-54 ≥0.15 1500 180 7050x4110x3750 64
XY-4r1830 610x1830 6-60 ≥0.10 1600 67x4 8250x3860x4640 68
FQA-Problems of customer concern:
About machine performance quality
1.       Q: How to guarantee the quality of outsourcing parts?
          A: First choice more than 4 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.       Q: Which brand of electric part?
          A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB Customer can specify the brand.
3.       Q: Which PLC:
           A: Siemens, Omron, Mitsubishi
4.       Q: How to control the quality?
           A: There are inspectors for inspecting equipment quality and performance, after a ssembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1.        Q: When the guide engineer arrive at customer's factory?
           A:  If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1.        Q: What is the warranty time?
           A:   5 years after machine arrived at factory
2.        Q: How to solve the problem?
           A: Within half an hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.

China Manufacturer Hot Sale Rubber Calender
China Manufacturer Hot Sale Rubber Calender
China Manufacturer Hot Sale Rubber CalenderChina Manufacturer Hot Sale Rubber Calender
China Manufacturer Hot Sale Rubber Calender
China Manufacturer Hot Sale Rubber Calender

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier